Our process

Four steps,
in this order, every time.

The remote survey is free anywhere in Ghana, and produces a written scope, so what is quoted is what was seen. Calibration intervals, battery replacement and link checks are in the contract, not in a follow-up quotation.

The method

Survey, specify, commission, operate.

Each step produces something written that the next one is held to. Nothing moves forward on a verbal.

Free remotely, and produces a written scope

Survey

Coordinates taken, the zones walked with you online and plotted on the map. An engineer on site instead where the job needs one: what is already there, what power exists, what the radio path looks like, where a cabinet can go.

Against the site, not a catalogue

Specify

Instruments chosen against the measurement, the enclosure, the power available and the temperature the box will actually see.

Proven on site

Commission

Installed, wired, addressed and proven where it will live. Nothing is signed off on the strength of a bench test.

Inside the contract

Operate

Calibration intervals, battery replacement and link checks are in the contract, not in a follow-up quotation.

The platform

Where the readings arrive.

Readings are collected, buffered and forwarded to Telemetry-X, the platform customers sign in to. Alerts fire on the conditions you set, and where a site is built for it, outputs can switch a pump or move a valve.

Telemetry-X