What we do · RTUs & Gateways
RTUs & Gateways
The box between the site and everything else. It polls instruments, buffers locally, and forwards when the link returns.

What we measure
10 parameters on this area.
Every reading is timestamped on arrival. Where the link drops, the gateway holds the readings and forwards them when it returns.
What we measure · RTUs & Gateways
10 parameters · ticks are readings in 15 minutes · orange is event-driven
Parameter
SymbolUnit
Cadence
- 01Energy metersAC / DCpulse, Modbus1 min
- 02Dimmer and LDR—%, lux1 min
- 03Fuel sensorsL%5 min
- 04Solar, battery bank, UPSU, I, SoCV, A, %1 min
- 05Fire and smoke detectors—stateon change
- 06Flood detection—stateon change
- 07Gas and water leak detection—stateon change
- 08GPS and asset tracking—lat, lon1 min
- 09Geofencing—in / outon change
- 10On/off device control—commandon demand
What is fitted is decided at survey. This is the range we specify from, not a list of what every site gets.
Also monitored
The other four areas.
Environment
Air, water and effluent, recorded continuously rather than when someone remembers to take a reading.
11 parameters11 continuous
Open
Energy
Generators, street lighting, distribution assets and metering points, reporting state and consumption from wherever they are installed.
10 parameters9 continuous · 1 on event
Open
Agriculture
Water, power and climate on land nobody is standing on: tank levels, pump state, gate and store status.
9 parameters7 continuous · 2 on event
Open
Water Management
Wells, mains and reservoirs reporting between visits, so consumption is a continuous record rather than a monthly reading.
9 parameters8 continuous · 1 on event
Open
