ACCRA, GHANA MIOT MULTICOMIOT LIMITED [email protected] 023 210 0100
MulticomIOT MORE DATA. MORE VALUE.

Use cases

Situations,
not case studies.

We do not publish client names, sites or sectors, and we will not start. These are the failures the instruments are specified against, and what each one looks like while it is happening.

Situations

Overnightlevelrun statetimeLevel0.2 mPumpONAlarm04:12gatewayplatformalert

Agriculture · Water

A pump runs dry overnight

Nobody knows until someone is standing there in the morning. A level sensor and a run-state input turn that into a reading with a time on it.

LivemainschangeoverloadMainsOFFChangeoverNOLoadDARKgatewayplatformcall-out

Energy

A generator does not change over

The site is dark and the first anyone hears is a phone call. Changeover state is one digital input.

30 daysflowlevelhistoryDraw31 m³/dStep+17 m³Monthlyflathistoryplatformalert

Water

A tank drains between visits

Consumption looks normal on a monthly reading and abnormal on a continuous one. The step is visible the day it happens.

OutageinstrumentRTUbackhaulLinkDOWNBuffered412TimesKEPTgatewayplatformdelivered

RTUs & Gateways

A remote site cannot be reached

Where there is no line, the gateway holds readings and forwards them when the link returns, with their original times intact.

The simulations are illustrations built from synthetic values, not readings from any customer site. They show the shape of each failure, which is the part worth recognising. References are given on request with the client’s written permission.

Energy mesh metering

About RF Mesh AMI.

Electricity and water meters on the same RF mesh, each one also a repeater for the meters around it. A cluster needs one backhaul, not a modem per meter, and when a neighbour goes, the meters behind it re-form the route themselves instead of going quiet.

Indicative drawingNot a deployment map

01

Meter mesh

Electricity and water meters, each one also a repeater for the meters around it.

02

Collector

One per cluster. It gathers the mesh and carries it out over a single link.

03

Head-end system

Ours. It talks to the meters, and it is how a weakening node is visible before it goes quiet.

04

Meter data management

Ours. It decides what is a good reading before anything downstream sees it, and keeps the history behind every figure.

The head end and the meter data management system are ours: built here and run in our cloud, alongside Telemetry-X. Readings go out to your billing engine, ERP or SCADA over an API.

The drawing above is an illustration, not a network. What is fitted, how it is read and which functions are enabled are decided at survey and written into the scope. We do not publish client names, sites, coverage or meter counts.

Talk to an engineer

I want to know what my remote sites are doing